SAP Certified Associate - Extended Warehouse Management in SAP S/4HANA Exam Prep
Free practice questions

Free C_S4EWM Practice Questions

10 exam-style questions with answers and explanations, straight from our 1,030-question bank. Tap an answer to check yourself. When you're ready, take the scored version in the free practice test.

Start the free practice test → ★★★★★4.9/5 from 2,400+ candidates · No signup

These 10 free C_S4EWM questions are organized by exam domain, so you can see how each part of the SAP Certified Associate - Extended Warehouse Management in SAP S/4HANA blueprint is tested. Reveal the answer and explanation under each question.

Domain 1: Goods Receipt/Issue Process (11-20%)

Question 1

The full quantity of an outbound order is due to leave before the next replenishment run. Its delivery is fixed to batch B17. The pick face has too little B17, but an unrestricted reserve bin holds enough and is included in the permitted direct-picking search. An older B18 batch is available at the pick face; FIFO governs stock removal, and batch substitution is not permitted. Choose the fulfillment plan.

Show answer & explanation

Correct answer: A - Pick the required B17 quantity directly from the eligible reserve bin.

Question 2

An embedded EWM receipt remains in quality-inspection stock. QM has acceptable results and an acceptance usage decision, but the stock-release follow-up is still incomplete. The site's inspection process controls release to unrestricted use, and communication between QM and EWM is healthy. A supervisor proposes an independent stock-type change in EWM. What is the appropriate response?

Show answer & explanation

Correct answer: C - Complete the configured stock-release follow-up for the existing usage decision.

Domain 2: Configure/Maintain EWM Master Data (31-40%)

Question 3

A pallet is following layout-oriented storage control. Its putaway task from GR-01 to HR-01 is waiting while an HU task takes it to identification point ID-01. The HU task has just been confirmed, and the remaining route from ID-01 to HR-01 can be traveled directly. How does EWM continue the original putaway task?

Show answer & explanation

Correct answer: C - Change its source to ID-01 and activate it for HR-01.

Question 4

Vendor V100 owns consigned product P-410 in EWM warehouse W001. The business partner representing plant P100 is the party entitled to dispose of it. A consultant needs to maintain the product's putaway control indicator for this warehouse. Identify the correct master-data record.

Show answer & explanation

Correct answer: B - Warehouse product P-410, warehouse W001, disposal party P100.

Question 5

Serialized spare parts will be moved individually between bins and repacked into different handling units. Before the new product is introduced, the warehouse must choose a serialization design that retains each serial number's current bin throughout those movements. Which design meets the requirement?

Show answer & explanation

Correct answer: A - Use requirement C for the product's EWM serialization.

Question 6

During creation of an outbound warehouse request in W001, one item matches these four warehouse process type determination records. They are the only matching records; fields not listed are unrestricted. Z201: document type, item type, delivery priority. Z202: document type, item type, product determination indicator. Z203: item type, delivery priority, product determination indicator. Z204: document type, delivery priority, product determination indicator. Which process type wins the determination?

Show answer & explanation

Correct answer: B - Z201

Domain 3: Test E2E Process from ERP to EWM (31-40%)

Question 7

An inbound acceptance test is being adapted for embedded EWM in SAP S/4HANA. The ERP delivery has created an executable EWM inbound delivery, category PDI, with the correct product and quantity. The test flags a failure because it cannot find an earlier inbound delivery notification, category IDR. How should this finding be resolved?

Show answer & explanation

Correct answer: D - Remove the IDR prerequisite from this embedded inbound test.

Question 8

For an order-related replenishment run, the selected open warehouse requests require 151 EA and relevant picking stock is 26 EA. The warehouse product has a minimum of 50 EA, a maximum of 145 EA, and a minimum replenishment quantity of 24 EA. Storage-type-level replenishment and rough withdrawal-bin determination are enabled. Reserve stock is sufficient, with no open replenishments, competing movements, or additional capacity limits. How much should EWM replenish?

Show answer & explanation

Correct answer: D - 144 EA

Question 9

Saving an EWM delivery generates its print action automatically. Later, the PPF selection report selects the action, but the processing method is never called. The application reports that the delivery's current business state does not yet permit execution. Which PPF control explains this gap between action creation and execution?

Show answer & explanation

Correct answer: D - The start condition of the existing action.

Domain 4: Cross Process Settings (11-20%)

Question 10

A conveyor drive fault has stopped segment S1, and the affected equipment is secured for maintenance. The PLC still reports S1 as faulty; EWM checks segment readiness, and no bypass is configured for the waiting HUs. Route R2 is ready, physically independent, outside the maintenance isolation, and authorized to operate. Which dispatch response keeps permitted work moving while respecting the fault?

Show answer & explanation

Correct answer: B - Withhold new work for S1 and continue eligible movements through R2.

That's 10 of 1,030

The full bank has 1,020 more C_S4EWM questions with explanations.

Continue in the free practice test →

View plans